Industrial ventilation

Local exhaust, dilution and fume systems — designed to the manual, built in our shop.

3 min readUpdated Aug 2026

What this service covers

Engineering, fabrication and installation of industrial ventilation systems: local exhaust, dilution and exchange-air systems, cutting-table and portable fume extraction. We bring 75 years of combined ventilation knowledge to every project, with the ACGIH Industrial Ventilation Manual at the heart of our design practice — and MERV 15 filtration efficiency, the best in the industry (99.9% on 0.3 to 0.5 micron).

From survey to startup

  • Survey. Capture points, airflow measurement, duct routing, make-up air — your actual conditions, not a catalog assumption.
  • Design. Hood design and duct velocities to the ACGIH manual; equipment matched to the contaminant.
  • Fabricate. What needs fabricating comes out of our 18,000 sq/ft Fontana shop.
  • Install & commission. Our own field crews, through to verified airflow.
Welding & cutting fumeGrinding & finishingBatch dumpingProcess heat & dilutionPneumatic conveyingGeneral plant exhaust

Symptoms of a ventilation problem

What you noticeWhat it meansFix direction
Doors hard to open, or slam themselvesBuilding pressure imbalance — exhaust without makeup airEngineered makeup air, not propped doors
Dust hangs in the air long after the process stopsNo capture at the source; dilution doing collection’s jobLocal exhaust design at the dust-making points
One corner of the plant is always hot / hazyDead air zone — the flow path skips itRebalance; add extraction or destratification
Collector runs hard, room stays dustyHood design starving the capture velocityFix the hoods and duct runs, not the collector
Winter heating bills that hurtExhausting heated air with no recovery planBalance exhaust vs. makeup; recover where practical

From survey to startup

  • 1. Airflow survey — measure what the building actually does, not what the old drawings say.
  • 2. Design — capture velocities at sources, duct sizing, fan selection, makeup air path.
  • 3. Install — our crews, working around production.
  • 4. Balance and verify — measured flows at every branch, documented.

What to have ready

  • Building basics — rough dimensions, big openings, existing fans
  • The processes making dust, heat or fume — and where people work relative to them
  • The complaint — comfort, visibility, exposure readings, or all three

Frequently asked questions

What's the difference between this and dust collection?

Dust collection captures dust at known equipment sources. Ventilation handles the building’s air — fume, heat, dilution, make-up air. Most heavy plants need both, designed together.

Can you fix a system another contractor installed?

Yes. Underperforming systems are usually undersized airflow or bad hood design — measurable problems with engineering answers. We survey first, then tell you what it will actually take.

Do you handle make-up air?

Always. Exhausted air has to come from somewhere; if you don’t plan it, the building finds it through every door gap and the system underperforms. Make-up air is part of every design.